EXECUTIVE SUMMARY AS OF 31 MARCH 2026
GBI PROJECTS REGISTER – BY CATEGORIES
| STAGE | TOTAL AS OF 31 MARCH 2026 | NRNC NON RESIDENTIAL NEW CONSTRUCTION |
RNC RESIDENTIAL NEW CONSTRUCTION |
NREB NON RESIDENTIAL EXISTING BUILDING |
INC INDUSTRIAL NEW CONSTRUCTION |
IEB INDUSTRIAL EXISTING BUILDING |
ID INTERIOR |
T TOWNSHIP |
|---|---|---|---|---|---|---|---|---|
| Applied | 1,418 | 733 | 424 | 95 | 111 | 11 | 19 | 25 |
| Registered | 1,333 | 688 | 399 | 90 | 103 | 10 | 19 | 24 |
| Total Certified | 791(100%) | 396 (50%) |
250 (33%) |
44 (6%) |
56 (6%) |
6 (1%) |
13 (2%) |
16 (2%) |
| Provisional Certification DA/PA | 451 | 236 | 147 | 19 | 31 | 3 | 3 | 12 |
| Final Planning Certification FPA | 4 | N/A | N/A | N/A | N/A | N/A | N/A | 4 |
| Final Certification CVA | 272 | 113 | 110 | 17 | 20 | 2 | 10 | – |
| Renewal Certification RVA | 64 | 47 | 3 | 8 | 5 | 1 | – | – |
GBI PROJECTS REGISTRY – BY RATING LEVEL
| RATING LEVEL | TOTAL AS OF 31 MARCH 2026 | NRNC NON RESIDENTIAL NEW CONSTRUCTION |
RNC RESIDENTIAL NEW CONSTRUCTION |
NREB NON RESIDENTIAL EXISTING BUILDING |
INC INDUSTRIAL NEW CONSTRUCTION |
IEB INDUSTRIAL EXISTING BUILDING |
ID INTERIOR |
T TOWNSHIP |
|---|---|---|---|---|---|---|---|---|
| PLATINUM 86 to 100 points | 30 (4%) |
19 | 6 | 1 | 3 | – | – | 1 |
| GOLD 76 to 85 points | 143 (18%) |
76 | 44 | 4 | 10 | 1 | 5 | 3 |
| SILVER 66 to 75 points | 102 (13%) |
57 | 22 | 5 | 12 | – | 2 | 4 |
| Certified 50 t0 65 points | 516 (65%) |
244 | 188 | 34 | 31 | 5 | 6 | 8 |
| Total Certified | 791 | 396 | 260 | 44 | 56 | 6 | 13 | 16 |
GBI PROJECTS REGISTER – BY STATE/TERRITORIES
| STATE/TERRITORY | NOS. REGISTERED | NOS. RATED |
|---|---|---|
| Kuala Lumpur | 347 | 245 |
| Selangor | 425 | 236 |
| Penang | 206 | 111 |
| Putrajaya | 46 | 32 |
| Johor | 143 | 85 |
| Melaka | 22 | 9 |
| Sarawak | 42 | 27 |
| Sabah | 19 | 4 |
| Perak | 19 | 10 |
| Pahang | 12 | 4 |
| Negeri Sembilan | 24 | 14 |
| Kelantan | 3 | 2 |
| Kedah | 23 | 11 |
| Perlis | – | – |
| Terengganu | 2 | 1 |
| Labuan | – | – |
GROSS FLOOR AREA (GFA) OF GBI RATED BUILDINGS
| TOTAL AS OF 31 MARCH 2026 | NRNC NON RESIDENTIAL NEW CONSTRUCTION |
RNC RESIDENTIAL NEW CONSTRUCTION |
NREB NON RESIDENTIAL EXISTING BUILDING |
INC INDUSTRIAL NEW CONSTRUCTION |
IEB INDUSTRIAL EXISTING BUILDING |
ID INTERIOR |
|
|---|---|---|---|---|---|---|---|
| Gross Floor Area, sqm(As Submitted) | 31.7 million sqm (340.8million sqft) |
12.6 million (39.73%) |
15.5 million (48.90%) |
1.8 million (5.68%) |
1.7 million (5.36%) |
82k (0.26%) |
43k (0.14%) |
CARBON DIOXIDE (CO2) EMISSION REDUCTION OF GBI RATED BUILDINGS
| CO2 REDUCTION PROJECTION |
TOTAL AS OF 31 MARCH 2026 | NRNC NON RESIDENTIAL NEW CONSTRUCTION |
RNC RESIDENTIAL NEW CONSTRUCTION |
NREB NON RESIDENTIAL EXISTING BUILDING |
INC INDUSTRIAL NEW CONSTRUCTION |
IEB INDUSTRIAL EXISTING BUILDING |
ID INTERIOR |
|---|---|---|---|---|---|---|---|
| CO2 Emission Reduction (ktCO2e/annum, based on electricity energy reduction only @ 1kWh = 0.780 kg CO2 – Penisular 0.222 kg CO2 – Sarawak 0.527 kg CO2 – Sabah) |
2,015 | 1,269 | 405 | 207 | 113 | 19 | 2 |
Executive Summary Archive (PDF)
-
Executive Summary (DECEMBER)
-
Executive Summary (NOVEMBER)
-
Executive Summary (OCTOBER)
-
Executive Summary (SEPTEMBER)
-
Executive Summary (AUGUST)
-
Executive Summary (JULY)
-
Executive Summary (JUNE)
-
Executive Summary (MAY)
-
Executive Summary (APRIL)
-
Executive Summary (MARCH)
-
Executive Summary (FEBRUARY)
-
Executive Summary (JANUARY)