EXECUTIVE SUMMARY AS OF 30 SEPTEMBER 2025
GBI PROJECTS REGISTER – BY CATEGORIES
STAGE | TOTAL AS OF 30 SEPTEMBER 2025 | NRNC NON RESIDENTIAL NEW CONSTRUCTION |
RNC RESIDENTIAL NEW CONSTRUCTION |
NREB NON RESIDENTIAL EXISTING BUILDING |
INC INDUSTRIAL NEW CONSTRUCTION |
IEB INDUSTRIAL EXISTING BUILDING |
ID INTERIOR |
T TOWNSHIP |
---|---|---|---|---|---|---|---|---|
Applied | 1,398 | 724 | 421 | 94 | 105 | 11 | 18 | 25 |
Registered | 1,313 | 679 | 396 | 89 | 97 | 10 | 18 | 24 |
Total Certified | 765(100%) | 383 (50%) |
256 (33%) |
42 (5%) |
50 (7%) |
6 (1%) |
12 (2%) |
15 (2%) |
Provisional Certification DA/PA | 449 | 231 | 148 | 18 | 34 | 3 | 3 | 11 |
Final Planning Certification FPA | 4 | N/A | N/A | N/A | N/A | N/A | N/A | 4 |
Final Certification CVA | 252 | 108 | 105 | 16 | 12 | 2 | 9 | – |
Renewal Certification RVA | 60 | 44 | 3 | 8 | 4 | 1 | – | – |
GBI PROJECTS REGISTRY – BY RATING LEVEL
RATING LEVEL | TOTAL AS OF 30 SEPTEMBER 2025 | NRNC NON RESIDENTIAL NEW CONSTRUCTION |
RNC RESIDENTIAL NEW CONSTRUCTION |
NREB NON RESIDENTIAL EXISTING BUILDING |
INC INDUSTRIAL NEW CONSTRUCTION |
IEB INDUSTRIAL EXISTING BUILDING |
ID INTERIOR |
T TOWNSHIP |
---|---|---|---|---|---|---|---|---|
PLATINUM 86 to 100 points | 28 (4%) |
19 | 6 | 1 | 1 | – | – | 1 |
GOLD 76 to 85 points | 139 (18%) |
73 | 44 | 4 | 10 | 1 | 4 | 3 |
SILVER 66 to 75 points | 96 (13%) |
57 | 20 | 3 | 10 | – | 2 | 4 |
Certified 50 t0 65 points | 502 (66%) |
234 | 186 | 34 | 29 | 5 | 6 | 8 |
Total Certified | 765 | 383 | 256 | 42 | 50 | 6 | 12 | 16 |
GBI PROJECTS REGISTER – BY STATE/TERRITORIES
STATE/TERRITORY | NOS. REGISTERED | NOS. RATED |
---|---|---|
Kuala Lumpur | 345 | 243 |
Selangor | 420 | 203 |
Penang | 203 | 105 |
Putrajaya | 45 | 32 |
Johor | 140 | 79 |
Melaka | 22 | 9 |
Sarawak | 41 | 26 |
Sabah | 17 | 4 |
Perak | 19 | 10 |
Pahang | 12 | 4 |
Negeri Sembilan | 23 | 12 |
Kelantan | 3 | 1 |
Kedah | 21 | 9 |
Perlis | – | – |
Terengganu | 2 | 1 |
Labuan | – | – |
GROSS FLOOR AREA (GFA) OF GBI RATED BUILDINGS
TOTAL AS OF 30 SEPTEMBER 2025 | NRNC NON RESIDENTIAL NEW CONSTRUCTION |
RNC RESIDENTIAL NEW CONSTRUCTION |
NREB NON RESIDENTIAL EXISTING BUILDING |
INC INDUSTRIAL NEW CONSTRUCTION |
IEB INDUSTRIAL EXISTING BUILDING |
ID INTERIOR |
|
---|---|---|---|---|---|---|---|
Gross Floor Area, sqm(As Submitted) | 31.0 million sqm (333.7million sqft) |
12.3 million (39.81%) |
15.2 million (49.16%) |
1.7 million (5.57%) |
1.6 million (5.06%) |
82k (0.26%) |
42k (0.14%) |
CARBON DIOXIDE (CO2) EMISSION REDUCTION OF GBI RATED BUILDINGS
CO2 REDUCTION PROJECTION |
TOTAL AS OF 30 SEPTEMBER 2025 | NRNC NON RESIDENTIAL NEW CONSTRUCTION |
RNC RESIDENTIAL NEW CONSTRUCTION |
NREB NON RESIDENTIAL EXISTING BUILDING |
INC INDUSTRIAL NEW CONSTRUCTION |
IEB INDUSTRIAL EXISTING BUILDING |
ID INTERIOR |
---|---|---|---|---|---|---|---|
CO2 Emission Reduction (ktCO2e/annum, based on electricity energy reduction only @ 1kWh = 0.780 kg CO2 – Penisular 0.222 kg CO2 – Sarawak 0.527 kg CO2 – Sabah) |
1,967 | 1,243 | 398 | 206 | 99 | 19 | 2 |
Executive Summary Archive (PDF)
-
Executive Summary (DECEMBER)
-
Executive Summary (NOVEMBER)
-
Executive Summary (OCTOBER)
-
Executive Summary (SEPTEMBER)
-
Executive Summary (AUGUST)
-
Executive Summary (JULY)
-
Executive Summary (JUNE)
-
Executive Summary (MAY)
-
Executive Summary (APRIL)
-
Executive Summary (MARCH)
-
Executive Summary (FEBRUARY)
-
Executive Summary (JANUARY)