IN1 Is there a latest list of approved Innovation items?
A
Updated list of approved Innovation items including qualification details is as appended below:
Approved List of Innovations (as of 12 Dec 2011)
Innovation in Design & Enviromental Design Initiatives
Qualification Details
NR
R
Advance Air Filtration
Serve at least 50% of NLA.
Air & Dirt Separator System for Chilled Water System
Provide for 100% of chilled water system.
Auto Condenser Tube Cleaning System
Provide for 100% of chilled water system.
Bioswales
Provide for at least 25% of building perimeter.
Central Conveyance System (waste or material handling)
Serve at least 50% of NLA.
Central Vacuum System
Serve at least 50% of NLA.
Cold or Hot Aisle Containment System
Provide for entire Data Centre air-conditioning system (applicable to Data Centre building only).
Co-generation / Tri-generation
Serve at least 90% of the building's cooling capacity.
Condensate Water Recovery
Account for at least 50% of installed AHU/FCUs.
Dessicant Heat Recovery Wheel
Account for at least 50% of total building exhaust air system.
Dynamic Balancing Control Valve System for chilled water piping system
Provide for 100% of chilled water system.
Electrochromic Glazed Façade
Provide for at least 10% of glazed façade.
External Shading Devices
Provide for at least 50% of glazed façade.
Fire System Water Recycling during regular testing
Provide for all Sprinkler and Wet Riser systems.
Not applicable to Hose Reel system.
Heat Pipe Technology
Provide for at least 75% of PAHUs for purpose of RH control/improvement.
Herb Garden
Provide for at least 10% of landscape area or 20m2 whichever is the larger. For single residential dwelling provide for at least 25% of landscape area.
Efficacy to be higher than T5 for 50% of NLA.
Refer to FAQ 9.7 for details.
Light Pipes
Provide for at least 1% of NLA.
Mixed Mode / Low Energy Ventilation System
Serve at least 10% of NLA.
Non-Chemical Water Treatment Sysmtem
Provide for all cooling tower circuits (Note that chw circuit need not be included)
On-site Composting Facility / Composting Bins
Recycle landscape and organic waste (kitchen waste) to meet at least 50% of landscape fertilizer needs.
Parking Guidance System
Provide for non-allocated car park bays.
Recycling of Condensate Water for evaporative cooling
Evaporative cooling to include use of all condensate water recovered from at least 50% of installed AHU/FCUs.
Refrigerat Leak Detection & Recovery Facility
Provide refrigerant leak detection coverage for every chiller in accordance with specialist vendor's recommendations to effect automatic refrigerant pumpdown to external storage tank sized to recover full refrigerant charge for the largest chiller within each plantroom.
Regenerative Lift
Provide for at least 50% of installed lifts.
Self-cleaning Façade
Provide for at least 90% of façade area.
Sewer Waste Recycling System
Applicable to plant installed within building to recycle sewer waste into fertilizer products, e.g. pellets.
Solar Hot Water System
Provide for all showers.
Solar Thermal Cooling
Generate at least 10% of total cooling capacity.
T5 Lamps / Efficient Lighting
Provide for at least 90% of common/management areas.
Thermal / PCM / Thermal Mass Storage System
Account for at least 25% of total cooling capacity.
Turbine Ventilators
Provide for all applicable roof (pitched roof).
Vacuum Degasser Cleaning System for chilled water piping system
Provide for 100% of chilled water system.
Vertical Green Wall system
Provide for at least 10% of external wall/façade. Note that vertical greenery which is not an integral part of building façade may be included in the total greenery computation.
Waterless Urinals
Provide for all urinals.
Note:
1) NR refers to NRNC, NREB, INC & IEB rating tools.
2) R refers to RNC rating tool